
Subscribe & Follow
Sibanye-Stillwater CEO says lithium prices will rise

Prices for battery-grade lithium have declined but remain at historically high levels and the market is forecast to move to mounting deficits from 2025 onwards, according to SFA Oxford analysts.
Permitting problems and opposition by local groups had derailed a project in Serbia and jeopardised projects in Portugal and Spain, SFA Oxford analysts told a briefing.
Diversified miner Sibanye is developing its 80% owned Keliber lithium project in Finland at an initial cost of €656m. It expects to start delivering 15,000 metric tons of battery-grade lithium hydroxide annually to the European battery market from 2025.
The European Union is pushing to reduce its reliance on China, which dominates global battery metal supply, and has proposed a Critical Raw Materials Act (CRMA) that seeks to drive local production.
The act sets time limits on granting permits for strategic mining, recycling and processing projects, and requires large companies needing strategic materials in key technologies to do regular risk assessments of their supply chains.
But metals consultancy SFA Oxford says the EU is likely to miss its target of mining 10% of its lithium consumption domestically by 2030, partly due to permitting hurdles and local opposition, as battery electric vehicle demand grows amid a global drive towards cleaner energy.
Opposition, mostly from environmental groups, often challenges decisions to grant permits. Miners and analysts have also noted onerous conditions to obtain permits in Europe and the US, compared to Africa, for instance, where Chinese miners dominate the mining of lithium and other battery minerals such as cobalt.
Briefing analysts on Sibanye's battery metal projects, Froneman said "mounting social anger" in Europe and the US posed a challenge for new mining projects.
"I think many of the projects are going to really struggle to come online, which will ultimately drive up the price of lithium and impact the cost of battery electric vehicles," Froneman said.
Sibanye is currently awaiting a decision on appeals against an environmental permit it received for the Rapasaari mine and concentrator, part of the Keliber lithium project.
Management says construction of both the mine and concentrator was going ahead while the appeal process was underway.
Source: Reuters

Reuters, the news and media division of Thomson Reuters, is the world's largest multimedia news provider, reaching billions of people worldwide every day.
Go to: https://www.reuters.com/Related
Rainbow Chicken rebounds with profit surge, cautions on bird flu impact 7 Mar 2025 Rains affect Amplats Tumela production 24 Feb 2025 2025 Budget Speech: Financial incentives key to accelerating EV transition 18 Feb 2025 Neal Froneman to retire after transformative 12 years 14 Feb 2025 Electric vehicles in Africa: what’s needed to grow the sector 11 Feb 2025 Sibanye-Stillwater CCDO resigns for personal reasons 27 Jan 2025 Post-election unrest hits Maputo port volumes 22 Jan 2025 Study: AI and electric vehicles set to drive major changes in fleet management 19 Dec 2024
